In September 2024, Tata Power announced the commissioning of its expanded 300 MW Dholera solar installation โ featuring India’s largest single-axis solar tracker system, cementing the Dholera Solar Park as one of Gujarat’s flagship renewable clusters adjacent to the SIR.
Why it matters to Dholera: the renewable base keeps compounding โ power supply is a headline input for every semiconductor and data-centre prospect evaluating the region.
What came next: continued ramp-up tracked in Ch. 14, with the fab’s power demand arriving through 2025โ26.
Verified sources
This is an archive entry from our milestone backfill โ verified against the sources below, with the event date kept true to history.
