A 920 sq km plan needs a first move. Dholera’s was the Activation Area - one complete slice of the city, designed, funded and built first.

What it is

The Activation Area is a sub-area of roughly 22.5 sq km inside Dholera's Development Plan, selected so that one complete slice of the city - all its land uses plus the supporting trunk infrastructure - could be designed, funded and built as a coherent first demonstration. It is not a separate plan: it inherits the Development Plan's zone assignments, road geometry and utility routing.

The geography, to scale

The nesting runs: the full DSIR developable area under TP schemes 1-6 (580 sq km), Phase 1 within it (TP 1 and TP 2 - 153 sq km), and the Activation Area (22.54 sq km). Per the May 2015 sanction, it was carved from TP2-East (18 sq km) plus part of TP4 (4.5 sq km).

What was sanctioned

The Cabinet Committee on Economic Affairs approved ₹2,784.83 crore of trunk infrastructure in May 2015: roads and services, the ABCD building (Phase-1), a Water Treatment Plant, a Sewage Treatment Plant and a Common Effluent Treatment Plant - invested by the DMIC Trust as equity in DICDL.

What stands today

The trunk works were confirmed complete in the state's May 2025 on-site review: roads with underground utility corridors, the treatment plants, and the ABCD building - which houses the ICCC, now in system testing. Serviced plots are being allotted to industrial tenants, and the Tata semiconductor fab - notified as an SEZ in April 2026 at 66.166 hectares - is being built inside TP2-East, part of the activation geography.

Why it exists

The activation logic is the plan's defining bet: prove the model - serviced land, working utilities, first industries - before spreading investment thin across 920 sq km. The full spatial logic is in Chapter 8, and what physically stands is tracked in ground reality.

Verified sources

Primary records behind the claims above.

  • OfficialPIB - CCEA approves trunk infrastructure in Dholera SIR, 30 May 2015
  • OfficialGovernment of Gujarat - activation area on-site review, May 2025
  • OfficialSEZ notification - Tata Electronics fab, 9 April 2026
  • OfficialDSIRDA - activation area and nesting figures
Where next

Keep reading — the deep chapters carry the full record.

Dholera 101 Ground reality